NIPSCO HomeBack to Table of ContentsPreviousNext

NORTHERN INDIANA PUBLIC SERVICE COMPANY
IURC Gas Service Tariff
Original Volume No. 5
Original Sheet No. 11B

RATE 325
RATE FOR GAS SERVICE
GENERAL SERVICE - LARGE

No. 3 of 3 Sheets

GENERAL TERMS AND CONDITIONS

  1. Definitions

    The term "day" shall mean a period of twenty-four (24) consecutive hours, beginning and ending at 12:00 noon, Central Standard Time. The term "cubic foot" shall mean the volume of gas which occupies one cubic foot when such gas is at a temperature of 60° F, and at a pressure of 14.65 pounds per square inch absolute.

    The term "Ccf" shall mean 100 cubic feet of gas.

    The term "British thermal unit" shall mean the amount of heat required to raise the temperature of one pound of water 1° F at 60° F.

    The term "Maximum Daily Demand" shall mean the maximum quantity of gas delivered to the Customer during any day in the billing month.

  2. Rules and Regulations

    The Company's General Rules and Regulations Applicable to Gas Service are applicable to service supplied hereunder.

  3. Force Majeure

    The Company will use reasonable diligence to provide a regular and uninterrupted supply of gas but does not guarantee such supply. Neither the Company nor the Customer shall be liable to the other for damages caused by the interruption, suspension, reduction or curtailment of the delivery of gas hereunder due to, occasioned by, or in consequence of, any of the following causes or contingencies, viz: acts of God, the elements, storms, hurricanes, tornadoes, cyclones, sleet, floods, lightning, earthquakes, landslides, washouts or other revulsions of nature, epidemics, accidents, fires, collisions, explosions, strikes, lockouts, differences with workmen or other industrial disturbances, vandalism, sabotage, riots, inability to secure cars, oil, coal, fuel or other materials, supplies or equipment, breakage or failure of machinery, equipment, compressors, mains, pipes, delivery lines, storage or delivery facilities, wars, insurrections, blockades, acts of the public enemy, arrests and restraints of rulers and people, civil disturbances, federal, state or other governmental laws, orders, decrees, restraints or regulations, the Company's inability to secure natural gas, or failure of the natural gas supply, or curtailment or diminution of natural gas deliveries to the Company by its supplier and any other causes or contingencies not within the control of the party whose performance is interfered with, whether of the kind herein enumerated or otherwise. Settlement of strikes and lockouts shall be wholly within the discretion of the party having the difficulty. Such causes or contingencies affecting performance shall not relieve the Company or Customer of liability in the event of its concurring negligence or in the event of failure of either to use due diligence to remedy the situation and remove the cause in an adequate manner and with all reasonable dispatch, nor shall such causes or contingencies or any thereof relieve either form its obligation to pay amounts due hereunder or to pay demand charges or minimum bills accruing during such interruption or suspension of service.



    Issued Date Issued By
    Edmund A. Schroer
    Chairman and President
    Effective Date
    October 31, 1988 Hammond, Indiana October 31, 1988

    PreviousNext